Guided missile frigate USS Kauffman (FFG-59)

Guided missile frigate USS Kauffman (FFG-59) 0Guided missile frigate USS Kauffman (FFG-59) 1Guided missile frigate USS Kauffman (FFG-59) 2Guided missile frigate USS Kauffman (FFG-59) 3

Classification

Type:

Basic information

Namesake:
Vice Admiral James L. Kauffman, Rear Admiral Draper L. Kauffman
Operator:
Country of build:
Ordered:
Laid down:
Launched:
Commissioned (service):
Decommissioned (out):
Status:
Fate:
Decommissioned, on hold for foreign military sale, 18 September 2015

Ship measurements

Displacement:
4,200 t
Length:
138 m
Beam:
14 m
Draft:
6.7 m

Machine

Propulsion system:
Propulsion:
  • 2 * General Electric LM2500-30 gas turbines generating 41,000 shp (31 MW) through a single shaft and variable pitch propeller
  • 2 * Auxiliary Propulsion Units, 350 hp (260 kW) retractable electric azimuth thrusters for manoeuvring and docking
Speed:
29 knots
Range:
5,000 nautical miles at 18 knots (9,300 km at 33 km/h)

Personnel

Complement:
205

Combat assets

Electronics:
  • AN/SPS-49 air-search radar
  • AN/SPS-55 surface-search radar
  • CAS and STIR fire-control radar
  • AN/SQS-56 sonar
  • AN/SLQ-32
Armament:
  • 1 * OTO Melara Mk 75 76 mm/62 caliber naval gun
  • 2 * Mk 32 triple-tube (324 mm) launchers for Mark 46 torpedoes
  • 1 * Vulcan Phalanx CIWS
  • 4 * .50-cal (12.7 mm) machine guns.
  • 1 * Mk 13 Mod 4 single-arm launcher for Harpoon anti-ship missiles and SM-1MR Standard anti-ship/air missiles (40 round magazine)
Aircraft:
  • 2 * SH-60 LAMPS III helicopter

USS Kauffman (FFG-59), an Oliver Hazard Perry-class guided missile frigate, was a ship of the United States Navy named for Vice Admiral James L. Kauffman (1887–1963) and his son, Rear Admiral Draper L. Kauffman (1911–1979), both experts in sub-surface naval missions.

Kauffman was laid down on 8 April 1985 by the Bath Iron Works, Bath, Maine; launched on 29 March 1986; sponsored by Mrs. Elizabeth Kauffman Bush, the daughter of Vice Admiral James L. Kauffman and sister of Rear Admiral Draper L. Kauffman; and commissioned on 28 February 1987 at Bath, Maine. She was the frigate long-hull variant (Flight II).

No comments yet