Guided missile destroyer ROKS Dae Jo-yeong (DDH-977)
Classification
Ship class:
Type:
Basic information
Operator:
Country of build:
Launched:
Commissioned (service):
Status:
Ship measurements
Displacement:
5,500 t
Length:
150 m
Beam:
17.4 m
Draft:
9.5 m
Machine
Propulsion system:
Propulsion:
- 2 * General Electric LM2500 Gas Turbines (58200 hp)
- 2 * MTU 20V956 TB92 Diesel Engines
- 2 * shafts, 2 * controllable pitch propellers
Speed:
30 knots
Range:
5500 nmi
Personnel
Complement:
200
Combat assets
Electronics:
- Raytheon AN/SPS-49(V)5 2D long-range radar (LRR)
- Thales Nederland MW08 3D target indication radar (TIR)
- AN/SPS-95K navigation radar
- Thales Nederland STIR 240 fire-control radars with OT-134A continuous wave illumination (CWI) transmitters
- SLQ-200(V)K SONATA electronic warfare system
- Thales TACTICOS combat management system
- BAE/Samsung KDCOM-II combat data system
- BAE WDS Mk.14 weapon direction system
- Samsung/Thales Naval Shield integrated combat management system
- ATLAS DSQS-21BZ hull mounted sonar
- SQR-220K towed array sonar system (TASS)
- K-DAGAIE Mk.2 decoy system
- Mk.36 SRBOC decoy system
- SLQ-261K torpedo acoustic counter measure system (TACM)
- SLQ-200K Sonata EW suite and jammers
- Daewoo towed torpedo decoy system
Armament:
- 1 * 5"/54 caliber Mark 45 gun
- 1 * Goalkeeper CIWS
- 64 * VLS
- 21 * RIM-116 Rolling Airframe Missile
- 8 * RGM-84 Harpoon
- 2 * triple K745 Blue Shark Torpedo
Aircraft:
- 2 * Westland Lynx Mk.99A (AW159 Wildcat)
ROKS Dae Jo-yeong (DDH-977) is a Chungmugong Yi Sun-sin-class destroyer in the Republic of Korea Navy. She is named after Dae Jo-yeong.
The KDX-II is part of a much larger build up program aimed at turning the ROKN into a blue-water navy. It is said to be the first stealthy major combatant in the ROKN and was designed to significantly increase the ROKN's capabilities.
ROKS Dae Jo-yeong was launched on 12 November 2003 by Daewoo Shipbuilding and commissioned on 30 June 2005.
ROKS Dae Jo-yeong, ROKS Park Wi and ROKS Yulgok Yi I participated in RIMPAC 2018 which will last from 27 June to 2 August 2018.
- Comments
No comments yet
Log in or Register to write comments