Патрульний корабель Furor (P 46)

Патрульний корабель Furor (P 46) 0Патрульний корабель Furor (P 46) 1Патрульний корабель Furor (P 46) 2

Основна інформація

Країна будівництва:
Компанія будівник:
Замовлено будівництво:
Закладений:
Спущений на воду:
Прийнятий:
Статус:
Номер MMSI:
224067000

Головні розміри

Водотоннажність:
2 860 т
Довжина:
93.9 м
Ширина:
14.2 м
Осадка:
4.2 м

Машина

Комбінована установка:
Силова установка:
  • 2 * 5,200 kW Diesel engines
  • 2 * 750 kW Electric motors
  • 2 * shaft lines
  • 2 * CP propellers
Швидкість:
21 вуз
Дальність плавання:
3,500 nautical miles (6,500 km; 4,000 mi)

Персонал

Екіпаж:
46
Екіпаж місії:
30

Бойові сили та засоби

Електроніка:
  • 1 * 2D LPI Air/Surface surveillance radar
  • 1 * IFF (Interrogation & transponder)
  • 1 * Navigation radar
  • 1 * EO Surveillance and Tracking system
  • 1 * Radar-EO fire control system director
  • 1 * ESM system Radar band
  • 1 * ESM system Communications band
Озброєння:
  • 1 * cannon 76 mm/62 gun
  • 2 * 25 mm automatic mountings
  • 2 * 12.7 mm machine guns
Авіація:
  • 1 * NH-90

Furor (P-46) is an offshore patrol vessel and the sixth of the Meteoro class created for the Spanish Navy.

On May 7, 2014, SEPI announced that it had approved the construction of two new units, one to be built at the Cadiz shipyard in San Fernando / Puerto Real and the other at Ferrol.[3] The first sheet metal cut for these vessels, was carried out simultaneously in the shipyards of the bay of Cadiz and those of the Ferrol estuary on December 5, 2014. Order No. DEF/1564/2015 was published in the Official State Gazette on June 26, 2015, which names of these two ships as Audaz (P-45) and Furor (P-46).

On April 29, 2016, the first of the ship's blocks was placed on a grade. Its delivery to the Spanish Navy is scheduled for 2018. The launching of the ship has been delayed several times due to labor conflicts with the employees of Navantia. The launch planned for July 2017 and, after three attempts, was postponed in early September and, due to new conflicts, the launch was delayed a few weeks, scheduled for mid or late that month. Finally, the sixth ship of the class, called Furor, was launched on September 8, 2017, in a private act (something atypical, as they are usually launched in a public act) and without being finished the structure, since the superstructure is not yet assembled. The ship was commissioned on January 21, 2019.

Немає коментарів. Ваш буде першим!