Фрегат «Рейнланд-Пфальц» (F225)
Основная информация
Оператор:
Страна постройки:
Изготовитель:
Заложен:
Cпущен на воду:
Принят:
Статус:
Главные размерения
Водоизмещение:
7 200 т
Длина:
149.52 м
Ширина:
18.8 м
Осадка:
5 м
Машина
Комбинированная установка:
Силовая установка:
- 1 * 20 MW gas turbine
- 2 * 4.7 MW electric motors
- 4 * 2.9 MW diesel generators
- 3 * gearboxes: one for each shaft and one to crossconnect the gas turbine to them
- 2 * shafts, driving controllable pitch propellers
- 1 * 1 MW bow thruster
Скорость:
20 уз
Дальность плавания:
4,000 nautical miles (7,400 km)
Персонал
Экипаж:
190
Боевые силы и средства
Грузовые возможности:
- Space for two 6.1 m (20 ft 0 in) containers
Лодки и десантные катера:
- Submarine ROVs
- 4 * 11 m (36 ft 1 in) RHIB, capable of more than 40 kn (74 km/h)
Электроника:
- 1 * Cassidian TRS-4D AESA radar
- 2 * navigation radars
- IFF diver and swimmer detection sonar (no anti-submarine sonar)
- Laser warning KORA-18 Combined RADAR and COMMS ESM from GEDIS
- Link 11, Link 16, Link 22 communications systems
- TKWA/MASS (Multi Ammunition Softkill System)
- ECM
Вооружение:
- 1 * 127 mm lightweight Otobreda naval gun with guided VULCANO ammunition for land-attack missions (range: more than 100 km (62 mi))
- 2 * 27 mm MLG 27 remote-controlled autocannons
- 5 * 12.7 mm Hitrole-NT remote-controlled machine gun turrets
- 2 * 12.7 mm heavy machine guns (manually controlled)
- 2 * RAM Block II surface-to-air missile launcher/CIWS, 21 cells each
- 8 * RGM-84 Harpoon anti-ship missiles (interim solution until joint sea/land attack missile RBS 15 MK4 becomes available)
- Water cannons
Авиация:
- 2 * NH-90 helicopters
Rheinland-Pfalz (F225) is the fourth ship of the Baden-Württemberg-class frigates of the German Navy.
Rheinland-Pfalz was designed and constructed by ARGE F125, a joint-venture of Thyssen-Krupp and Lürssen. She is part of the Baden-Württemberg class have the highest displacement of any class of frigate worldwide and are used to replace the Bremen class.
Rheinland-Pfalz was laid down on 29 January 2015 and launched on 24 May 2017 in Hamburg. She was delivered to the German Navy in January 2022.
- Комментарии
Нет комментариев
Войдите или зарегистрируйтесь чтобы добавлять комментарии