Эсминец УРО USS Shoup (DDG-86)
Основная информация
Главные размерения
Машина
- 3 * Allison AG9140 Generators (2,500 kW (3,400 hp) each, 440 V)
- 4 * General Electric LM2500 gas turbines each generating 26,250 bhp (19,570 kW)
- 2 * shafts, each driving a five-bladed reversible controllable-pitch propeller
- Total output: 105,000 bhp (78,000 kW)
Персонал
Боевые силы и средства
- 2 * RHIB
- AN/SPY-1D 3D radar
- AN/SPS-67(V)2 surface-search radar
- AN/SPS-73(V)12 surface-search radar
- AN/SPG-62 fire-control radar
- AN/SQS-53C sonar array
- AN/SQR-19 tactical towed array sonar
- AN/SQQ-28 LAMPS III shipboard system
- AN/SLQ-32(V)3 Electronic Warfare System
- AN/SLQ-25 Nixie Torpedo Countermeasures
- MK 36 MOD 12 Decoy Launching System
- MK 53 Nulka Decoy Launching System
- AN/SLQ-39 CHAFF Buoys
- 1 * 20 mm Phalanx CIWS
- 1 * 5-inch (127 mm)/62 Mk. 45 Mod 4 (lightweight gun)
- 2 * 25 mm Mk 38 Autocannons
- 96-cell Mk. 41 Vertical Launching System (VLS)
- BGM-109 Tomahawk Land Attack Missile
- RIM-66M Surface-to-Air Missile with an ASuW mode
- RIM-156 Surface-to-Air Missile
- RIM-161 Anti-Ballistic Missile
- RIM-162 ESSM quadpacked configuration
- RUM-139 Vertical Launch ASROC
- RIM-174A Standard ERAM
- 2 * Mark 32 triple torpedo tubes:
- Mark 46 torpedo
- Mark 50 torpedo
- Mark 54 Lightweight Torpedo
- 2 * SH/MH-60R Seahawk LAMPS III helicopters
- Aviation facilities:
- Flight deck and enclosed hangars for two MH-60R LAMPS III helicopters
USS Shoup (DDG-86) is an Arleigh Burke-class (Flight IIA) Aegis guided missile destroyer in the United States Navy. The ship is named for Medal of Honor recipient General David M. Shoup, the 22nd Commandant of the Marine Corps.
Construction, on the 36th destroyer of her class, began at the Northrop Grumman Ship Systems' Ingalls Operations on 10 November 1998. Shoup was the 16th ship of this class to be built at Ingalls Shipbuilding. Her keel was laid on 13 December 1999 and she was launched on 22 November 2000. Shoup sailed into the Gulf of Mexico for the first of her sea trials on 11 December 2001. The vessel was delivered to the Navy by Northrop Grumman on 18 February 2002 and departed Pascagoula, Mississippi on 22 April 2002. Shoup was commissioned on 22 June 2002 at Port Terminal 37 in Seattle, Washington.
- Комментарии